To make the turbine installation successful it is very important to follow the simple things. The installation success starts at the very beginning with proper application engineering. Several things like steam parameters, selection of turbine type, gearbox, alternator, control system, power evacuation, etc. are important during application engineering.

During the installation of the Turbine readiness of the site contributes to the successful installation. The steam piping’s stress analysis should be done properly and piping should be supported properly according to the stress analysis report. The steam blowing should be done until the desired target plate reading is observed. The steam consumption in the process and a total electrical load of the plant should also be matched with the Turbine design parameter or alternative provisions should be done to overcome the problem.

Success of Steam Turbine - Application Engineering to Installation